V2G (Vehicle-to-Grid)
Module:
insight(always on) | Role: Any member | Licence: Free+
Model: Same Monte Carlo charging model as V1G, plus bidirectional export capability during DR events.
Additional Parameters
| Parameter | Default | Notes |
|---|---|---|
| Export rate | 5 kW | Rate of energy export during DR events |
| Export compliance | 0.8 | Fraction of fleet that exports |
| Export start/finish | HH:MM | Export window |
During DR events, compliant V2G vehicles export energy at the configured rate. The exported energy is reimported later when charging resumes, ensuring the vehicle still receives its required energy.
Flexibility Modes
Same as V1G: unmanaged, passive, active, optimized — with the addition of export behavior during DR windows. See EV Smart Charging for full distribution detail.
Limitations
- V2X revenue projections assume battery degradation costs are manageable
- Export rate is fixed (does not model variable export based on grid signal)
- Does not model bidirectional charger hardware constraints