Hosting Capacity Data & Methodology
Hosting Capacity Data & Methodology
Module:
insight(always on) | Role: Any member | Licence: Free+ Tools:query_hosting_capacity,analyze_hosting_capacity_constraints,calculate_hosting_capacity_deferral_benefit,set_scenario_capacity_limit
Grid hosting capacity data powers the platform's infrastructure analysis, showing where new DER (EVs, batteries, solar) can interconnect and where the grid is constrained.
Data Sources
Hosting capacity data is sourced from public utility Integration Capacity Analysis (ICA) maps:
| Utility | Source | Coverage | Update Frequency | Status |
|---|---|---|---|---|
| PG&E | Public API | Northern/Central California | Quarterly | Active |
| SDG&E | Public API | San Diego County, CA | Quarterly | Active |
| ConEd | Public API (hosting capacity maps) | Westchester County, NY | Quarterly | Active |
| National Grid MA | Public API | Massachusetts | Quarterly | Active |
| SCE | Requires authentication | Southern California | — | Not currently available |
What the Data Includes
- Feeder-level capacity ratings (MW)
- Available headroom for new DER interconnection
- Constraint types (thermal, voltage, protection)
- Multi-year headroom projections (where available)
Infrastructure Deferral Financial Assumptions
Default financial parameters used in infrastructure deferral benefit calculations.
DER Flexibility Cost
- Default: $350,000 per MW ($0.35M/MW)
- Represents annualized cost of deploying and operating DER flexibility programs
- Includes: aggregation platform costs, customer incentives, program management
- Based on industry estimates for managed EV charging and battery dispatch programs
Traditional Upgrade Cost
- Default: $2,000,000 per MW ($2M/MW)
- Represents capital cost of traditional distribution infrastructure upgrades
- Includes: conductor upgrades, transformer replacements, substation expansion
- Range in practice: $1.5M-$4M/MW depending on location and scope
Discount Rate
- Default: 5% (nominal)
- Used for NPV calculation of deferred capital expenditure
- Represents weighted average cost of capital for regulated utilities
Methodology
NPV of deferral = (deferred_capital) / (1 + discount_rate)^years_deferred
Net benefit = NPV of deferral - DER flexibility cost
ROI multiple = NPV of deferral / DER flexibility cost
Limitations
- Data reflects utility planning models, not real-time grid conditions
- Hosting capacity maps are updated quarterly — may lag recent interconnections
- Projection accuracy degrades beyond 3-5 years
- Does not capture all local constraints (e.g., secondary transformer limits)
- Coverage limited to utilities with public ICA data
- DER flexibility cost is a point estimate — actual costs vary by program type and scale
- Single discount rate applied; real projects may use different rates for different components
- Does not account for O&M cost differences between traditional and DER solutions
- Does not model reliability or resilience benefits of distributed solutions