Skip to main content

Hosting Capacity Data & Methodology

Hosting Capacity Data & Methodology​

Module: insight (always on) | Role: Any member | Licence: Free+ Tools: query_hosting_capacity, analyze_hosting_capacity_constraints, calculate_hosting_capacity_deferral_benefit, set_scenario_capacity_limit

Grid hosting capacity data powers the platform's infrastructure analysis, showing where new DER (EVs, batteries, solar) can interconnect and where the grid is constrained.


Data Sources​

Hosting capacity data is sourced from public utility Integration Capacity Analysis (ICA) maps:

UtilitySourceCoverageUpdate FrequencyStatus
PG&EPublic APINorthern/Central CaliforniaQuarterlyActive
SDG&EPublic APISan Diego County, CAQuarterlyActive
ConEdPublic API (hosting capacity maps)Westchester County, NYQuarterlyActive
National Grid MAPublic APIMassachusettsQuarterlyActive
SCERequires authenticationSouthern California—Not currently available

What the Data Includes​

  • Feeder-level capacity ratings (MW)
  • Available headroom for new DER interconnection
  • Constraint types (thermal, voltage, protection)
  • Multi-year headroom projections (where available)

Infrastructure Deferral Financial Assumptions​

Default financial parameters used in infrastructure deferral benefit calculations.

DER Flexibility Cost​

  • Default: $350,000 per MW ($0.35M/MW)
  • Represents annualized cost of deploying and operating DER flexibility programs
  • Includes: aggregation platform costs, customer incentives, program management
  • Based on industry estimates for managed EV charging and battery dispatch programs

Traditional Upgrade Cost​

  • Default: $2,000,000 per MW ($2M/MW)
  • Represents capital cost of traditional distribution infrastructure upgrades
  • Includes: conductor upgrades, transformer replacements, substation expansion
  • Range in practice: $1.5M-$4M/MW depending on location and scope

Discount Rate​

  • Default: 5% (nominal)
  • Used for NPV calculation of deferred capital expenditure
  • Represents weighted average cost of capital for regulated utilities

Methodology​

NPV of deferral = (deferred_capital) / (1 + discount_rate)^years_deferred
Net benefit = NPV of deferral - DER flexibility cost
ROI multiple = NPV of deferral / DER flexibility cost

Limitations​

  • Data reflects utility planning models, not real-time grid conditions
  • Hosting capacity maps are updated quarterly — may lag recent interconnections
  • Projection accuracy degrades beyond 3-5 years
  • Does not capture all local constraints (e.g., secondary transformer limits)
  • Coverage limited to utilities with public ICA data
  • DER flexibility cost is a point estimate — actual costs vary by program type and scale
  • Single discount rate applied; real projects may use different rates for different components
  • Does not account for O&M cost differences between traditional and DER solutions
  • Does not model reliability or resilience benefits of distributed solutions